Free room + task estimator

Selected rooms need person-hours—not a mystery rate.

Build a cleaning-time estimate from the areas and tasks actually included, then carry those hours into a visible cost and target planning floor.

No email gate. No customer data. Nothing is submitted or stored.

01

Turn selected scope into person-hours.

The prefilled values are an editable demonstration—not industry norms. Replace every quantity and minute assumption with your own comparable-job evidence.

Use generic labels only. Do not enter a customer name, address, access code, health detail, private note, or another person’s information. Nothing is submitted or stored.

02

Carry the hours into a cost floor.

Keep all money inputs in the same currency. The result is a planning model—not a recommended market price or client promise.

Total person-hours0.0 h0.0 h–0.0 h working range
Even-split onsite time0.0 h1 worker; work may not split evenly
Estimated total cost$0$0 modeled labor cost
Target planning floor$0total cost ÷ (1 − target margin)

03 / Use your evidence

A room count is a structure—not a duration.

A kitchen, bathroom, or bedroom does not contain a universal number of minutes. Use the same labels across comparable jobs, record actual person-hours, and revise one assumption when a pattern appears.

  • Separate first visits from recurring maintenance.
  • Keep crew size separate from total person-hours.
  • Include setup, equipment handling, and close-out work.
  • State where condition or access is still unconfirmed.
  • Compare the estimate with actuals after the job.

04 / Quick answers

Cleaning time and quote FAQ

Why not price a cleaning job from square footage alone?+

Square footage can be one workload signal, but it does not show which rooms are included, their condition, add-on tasks, access, setup, or the difference between a first visit and recurring maintenance. This estimator starts with the selected scope and the operator’s own time assumptions.

What are person-hours?+

Person-hours add the working time of every crew member. Two cleaners working for two hours use four person-hours. Crew size can shorten elapsed onsite time, but it does not erase labor cost.

Where should the minutes come from?+

Use comparable completed-job records when available. Keep first visits, recurring work, materially different conditions, and different service types separate. Treat the prefilled numbers as an interface demonstration only.

Does this calculator tell me what to charge?+

No. It exposes one modeled cost and target planning floor from the assumptions entered. The operator still validates scope, taxes, wage and employment costs, market conditions, contracts, and the final price.

Does TidyMargin receive the numbers?+

No. The calculator runs in the browser and has no form submission, account, or email gate. Use generic labels and keep personal or client information out.

Educational planning tool only. It does not provide accounting, tax, legal, employment, safety, insurance, contract, or pricing advice and does not guarantee labor time, profit, bookings, or an appropriate market price.